Projects
A brief overview of some of our projects.
Stryker, Belfast
JOB DESCRIPTION:- Electrical Design and Installation
As part of Stryker Belfast expansion we have the privelege of fitting out their new building. This includes energy efficient lighting, general purpose power, power distribution, Cat 6 data network, CCTV & Alarm Services, Fire Alarm.
We have worked closely with Strykers Facilities Team to help deliver this design and build project.
VALUE:- Undisclosed*
DURATION:- September 2017 - Winter 2018
Obel Tower, Belfast
MAIN CONTRACTOR: - SB Contracts NI
JOB DESCRIPTION:- Fixed Wire Testing
As part of renovations to Belfasts landmark Obel Tower we have been tasked with carrying out Electrical Installation Condition Reports to the 233 apartments.
VALUE:- Undisclosed*
DURATION:- Early 2016 to Present
Mr and Mrs Shannon, Randalstown
MAIN CONTRACTOR: - Self Build
ARCHITECT: - Jane Burnside
JOB DESCRIPTION: - Domestic Installation
An example of a high end dwelling designed by award winning architect Jane Burnside. We worked closely with Brian and Heather to deliver the finish they desired. It was a pleasure working on this project with genuinely nice people. We wish them well in their luxurious new home.
VALUE:- Undisclosed*
Chipmongers, Ballymena
JOB DESCRIPTION: - LED Lighting and Minor Works
Having worked for the proprieter in his other business we were pleased to help him with this venture. We replaced the lighting with energy efficient LED Lighting and completed minor works including additional sockets and supplies for new machines.
DURATION:- May 2018
VALUE:- Undisclosed*
123 York Street, Belfast
MAIN CONTRACTOR: - Turkington Construction
M&E CONTRACTOR: - Michael Nugent Ltd
JOB DESCRIPTION: - Inspection & Testing for Initial Verification
We worked along with Michael Nugent Ltd on this project. We were reponsible for the initial verification of the electrical systems and providing as built drawings and labelling of Distribution Boards etc.
This large student accomodation covers 13 floors with 407 rooms, Ground Floor Retail Space and Reception Area.
DURATION: - May 2019 to September 2019
CCH Coca Cola Lisburn
CONTRACTOR: - Energy Facilities UK Ltd
JOB DESCRIPTION: - Installation of PCR and DMD devices
Installation of 32 PCR devices and 25 DMD devices. These devices are designed and manufactured by Energy Facilities UK Ltd. These devices are designed to monitor and maximise energy usage helping reduce running costs.
An important aspect for all businesses is managing overheads and these energy saving technologies help by maximising energy usage and reducing cost.
DURATION: - September 2019
RVH Theatres Project
MAIN CONTRACTOR: - Michael Nugent Ltd
JOB DESCRIPTION: - Provide Electrical Labour
Working along with Michael Nugent Ltd providing the electrical services to the theatre upgrades project. As works are being carried out in a live hospital environment we have had to adhere to all site rules and still maintain works on schedule.
This project involves New AHU supplies and associated BMS Cabling, Replacement Lighting to LED in Theatres, New Hybrid Theatre Installation and various other enabling works.
DURATION: - April 2019 to December 2019